Monday, August 17, 2009

SAP Tables - Project system (PS)

11.1 Basic data
• PRHI Work Breakdown Structure, Edges (Hierarchy Pointer)
• PROJ Project definition
• PRPS WBS (Work Breakdown Structure) Element Master Data
• RPSCO Project info database: Costs, revenues, finances
• MSPR Project stock
11.2 Equipment
• EQUI Equipment master data
• EQKT Equipment short text
• EQUZ Equipment time segment

3 comments:

  1. Nice article, I was really impressed by seeing this article, it was very intresting and it is very useful for SAP Training Learners.. We are Providing best sap ps online training in worldwide.

    ReplyDelete
  2. Interesting training and positive approach. Thanks guys.
    Talk to eight one two two two four one two eight six
    www.thecreatingexperts.com
    SAP MM

    ReplyDelete